PERHITUNGAN AVAILABILITY ASET
Periode :
Lokasi : name) ): ?> name); ?> Semua Lokasi
name) ): ?> 0): ?> name) ): ?>
No Sistem Equipment Komponen Bagian Lokasi Available (Jam) Unavailable (Jam) Availability Reliable Unreliable (Jam) Reliability
% %
Data Kosong
  Rata-rata Availability: % Rata-rata Reliability: %
  Rata-rata: {{$avg}}%
Rata-rata: {{$avg}}%
*/?>   Supervisor Pengendalian Aset
Operasi Produksi dan Distribusi
    Azwar Anas Reza
NIp 1.06.01344
*/ ?>